Data unlocking

I have to upload a new version of a CRF and reassign the previous versions to this version. Is there a way of unlocking all the locked events in one go (behind the scenes) instead of having to unlock each individual event in order to reassign the new CRF version?

Answers

  • haenselhaensel Posts: 537 ✭✭
    I highly recommend to try this with testdata only and never do it in a production environment since it is neither tested nor documented and your auditor might not accept such an intrusion.

    The table study_event has a column "subject_event_status_id" that holds the status of an event. The table event_crf has to be updated too (date_updated) to mimic the original behavior of oc.

    Regards,
    Christian